Coastal Walkway Structural Steel Installation

Industry

Construction

Location

Karratha Coastline, WA

Year

2018

Client

City of Karratha

Share

Coastal Walkway Structural Steel Installation

The Challenge

The project involved fabricating and installing structural steel supports for a coastal walkway exposed to salt, wind, and constant moisture. The client required a solution that could withstand long-term corrosion and high pedestrian loads while maintaining an architectural finish suitable for a public environment.

Our Approach

Our fabrication team engineered each component using marine-grade materials and precision welding techniques to ensure maximum structural integrity and corrosion resistance. All steelwork was treated with a multi-layer protective coating system and inspected prior to installation. The installation was completed efficiently within a narrow coastal corridor, adhering to strict environmental and safety protocols.

The Impact

The completed walkway structure now provides a safe, long-lasting, and visually appealing public pathway capable of withstanding the demands of a harsh marine climate. Through attention to detail and robust fabrication practices, KAW delivered a solution that enhances the coastal landscape while minimising long-term maintenance costs.

KAW car on a mine site.

Let's tackle the tough challenges together